The apartment renovation checklist

A single list to keep at hand, from the first photos to the day you get the keys back.

Author / technical lead: Bauman Raymond Attila · Last reviewed: 05/11/2026

Plastered corner with corner bead
In short

Before quotes: photograph the flat, decide the layout, list priorities. Choosing a contractor: ask for an itemised quote, who does the electrics and whether they are authorised, the guarantee and insurance, and how extras are approved. Before starting: inform the community, check municipal requirements, fix the kitchen and lighting plans. During works: check services before they are covered. At handover: walk through, collect certificates, photos and invoices.

What should you do before asking for quotes?

  • Photograph every room, the fuse board, the bathroom, the kitchen and any damage.
  • Measure or estimate the floor area.
  • Decide what you want to change: rooms, layout, level of finishes.
  • List what must be done (safety, leaks) and what would be nice.
  • Ask the administrator for the community rules and any planned works.
  • Find any documents on the installations, especially the electrical certificate.

What should you ask a contractor?

  • Is the quote itemised, with every task, unit and quantity?
  • What is included and excluded: materials, debris removal, final clean?
  • Who carries out the electrical work, and are they authorised? On our jobs, authorised partner installers.
  • Who coordinates the trades and who is your contact?
  • Is there a guarantee, and is there public liability insurance?
  • How are unexpected findings handled and approved?
  • Can you see photos of real work?

Our article on renovation mistakes explains why each question matters.

What should be settled before work starts?

  • Written notice to the community’s representative, as the horizontal property law requires.
  • Municipal requirements for your scope checked; in Andalusia many interior works use a declaración responsable (requirements to be verified case by case).
  • Final layout, kitchen plan and electrical points agreed.
  • Main materials chosen, or a schedule for choosing them.
  • Access arranged: keys, lift use, parking for deliveries.
  • Valuables and fragile items removed from the flat.

What should you check during the works?

  • Pipes pressure-tested before they are covered.
  • Electrical installation checked by the partner installer before walls close.
  • Photos taken of every pipe and cable route.
  • Waterproofing in showers done before tiling.
  • Any extra work explained, priced and approved in writing.
  • Common areas kept clean and the lift protected.

What should you receive at handover?

  • A walk-through of every room, testing taps, drains, sockets, lights and heating.
  • A list of any small items to finish, with an agreed date.
  • The electrical installation certificate issued by the authorised partner installer, where the scope required one.
  • Photos of the hidden services.
  • Invoices and the final itemised account.
  • Guarantee terms in writing.
  • Spare tiles and paint, labelled.
  • A clean flat.

How do we fit this checklist?

We work with itemised quotes, one point of contact, authorised partner installers for the electrics, a guarantee and public liability insurance, materials purchasing if you want it and a final clean. Unexpected findings are photographed and approved before any work on them. See how this applies to a full apartment renovation or a rental refurbishment.

What should you prepare if you live abroad?

  • A reliable way to share photos and documents, by email or WhatsApp.
  • Someone local who can give access for the visit and the works, and receive deliveries if needed.
  • A list of decisions you will need to make, with dates, so they can be made calmly at a distance.
  • Copies of the community rules and the administrator’s contact.
  • Clarity on who signs and pays, especially for inherited or jointly owned flats.

We give a first assessment from photos and the approximate floor area; the itemised quote follows a visit. We do not provide remote project management, so plan how decisions will be made while you are away.

Which red flags should make you pause?

  • A quote with a single figure and no breakdown.
  • Reluctance to say who will do the electrical work, or whether they are authorised.
  • Pressure to start immediately or pay a large sum before anything is agreed in writing.
  • No mention of the community, permits or debris removal.
  • Promises that nothing unexpected can happen in an older flat.
  • No written guarantee terms.

Any of these deserves a question before you sign. The answers usually tell you a great deal about how the rest of the job would go.

How do you use this checklist with a quote?

Put the quote next to the list and tick off each point. Where something is missing — debris removal, the final clean, who buys the materials, how extras are approved — ask for it to be written in. A good contractor will not mind; a clear quote protects both sides. If you are comparing several quotes, use the same list for each, so you compare the same scope rather than different promises.

Author / technical lead

Bauman Raymond Attila · Reforma Pisos Málaga · Avenida Antonio Belón 3, Marbella. Last reviewed: 05/11/2026.

FAQ

Frequently asked questions

What is the most important item on the checklist?

An itemised quote, and checking services before they are covered.

Do I need to inform the community?

Yes, before works start, as the horizontal property law requires.

Should I ask who does the electrics?

Yes. Electrical work must be done by authorised installers; ours are authorised partner installers.

What should I photograph before works?

Every room, the fuse board, bathroom, kitchen and any existing damage.

What documents should I get at the end?

Electrical certificate where issued, photos of services, invoices and guarantee terms.

Should I keep spare tiles?

Yes, labelled, for future repairs.

How are extras handled?

Explained, priced as a separate line and approved before they go ahead.

Do I need a permit?

It depends on the scope and town; many interior works in Andalusia use a declaración responsable.

What should I check at handover?

Every tap, drain, socket, light and radiator, room by room.

Can I download this checklist?

You can print this page; it is designed to be used as a list.

Free, itemised quote

Send us photos and the approximate floor area

A few photos and a rough square-metre figure are enough for a first assessment. If it suits you, we then visit the property and prepare an itemised quote, line by line.

  • One contractor, one point of contact
  • Itemised quote with no vague lump sums
  • Materials purchasing and final clean handled by us
  • Work carried out with a guarantee and public liability insurance
Will anyone live there during the works?